Replace the gas boiler. Keep the radiators.

Hestora is a thermal energy store that uses off-peak electricity to heat water overnight. That stored heat serves your existing radiators and hot water during the day, without burning gas or needing an outdoor unit.

Cutaway of a thermal store showing insulation around a pressurised water vessel. Published footprint 660 mm × 660 mm.
Illustrative thermal store cutaway · Not to scale

UKCA-certified prototype · Patent pending

£3,500 is the estimated installed cost after the Boiler Upgrade Scheme grant and carbon-offset funding. The grant is subject to MCS certification and approval.

Will it fit my home?

A 660 mm × 660 mm footprint for homes with wet central heating. A hot water cylinder is required. If you have a combi boiler without one, a cylinder is added during installation.

Read the home-fit FAQs

How Hestora works

Off-peak power goes in overnight. Heat and hot water come out when your home needs them.

  1. Charge overnightOff-peak electricity
  2. Store heatPressurised water
  3. Deliver on demandRadiators and hot water
Illustrative diagram of the home heating cycle

Charges overnight

Hestora heats water using electricity during a fixed off-peak tariff window, storing that energy for the day ahead.

Technical notes

Water can reach 175°C inside a pressurised vessel built to PD 5500:2024+A2 (Category 2). British Engineering Services independently tested it to 17.86 bar, over double its 8 bar operating pressure. Measured round-trip efficiency is about 90%. Standing loss is about 4 kWh/day, largely recovered as useful space heat.

Delivers heat on demand

Stored heat serves your radiators and hot water when you need it, using energy bought during off-peak hours.

Technical notes

Heat exchangers feed a conventional wet central-heating circuit and deliver mains-pressure domestic hot water. Hestora requires a hot water cylinder. The vessel arrives light and is filled on-site. Hestora is designed for a one-day swap without emitter upgrades or an outdoor unit.

Smart charging is planned

Hestora plans to introduce smart charging in 2027 so the store can charge when solar or wind power is plentiful.

Technical notes

A unit can absorb up to 40 kWh. Grid-responsive charging could earn rewards through NESO’s Demand Flexibility Service, including demand turn-up events.

A simple change for your comfort, your bills, and our planet.

Explainer video placeholder

See how Hestora works

A boiler replacement for a world without gas

See how Hestora charges overnight and delivers heating and hot water for the home you already have. The system uses water to hold heat and needs no gas, flue or outdoor unit.

40 kWh
One overnight charge covers the daily heat demand of roughly half of UK homes.
1 day
Designed for a one-day install with no outdoor unit or new radiators.
30+ years
Design life. Water, steel and insulation, with no refrigerants or battery cells.

A different bill. The same warm home.

Hestora is designed to replace a gas boiler, fit the heating system you already have and shrink your carbon footprint.

A cast-iron radiator beneath a curtained window
Stock photo placeholder
Lower bills
Off-peak charging uses lower-cost electricity. Optimised heating and high-grade insulation help reduce losses and running costs.
Simple retrofit
Designed for the home you already have, with the high flow temperatures existing radiators expect and no major changes to the building fabric.
Lower carbon
Zero emissions in the home. Shifting demand away from peak times supports a grid powered by more renewable electricity.

Making zero-emission heating accessible

Hestora’s mission is to make zero-emission heating accessible for every home. The team believes households should be able to heat their homes differently without rebuilding them.

Built in Britain
Based in the Midlands, Hestora sources components from UK companies to support British engineering.
University supported
Selected to join energy and enterprise programmes at Imperial College London and the University of Birmingham.

Engineered to British standards

The store uses water, steel and insulation to supply heat through existing radiators.

UKCA

Prototype certification

PD 5500:2024+A2 · Category 2

British Engineering Services tested the pressure vessel to 17.86 bar, more than twice its 8 bar operating pressure.

High-performance insulation
Built to retain heat with measured round-trip efficiency of about 90%.
High-capacity heat storage
Stores up to 40 kWh for peak heating and hot water needs.
Boiler-level flow temperatures
Delivers the high temperatures existing radiators expect.

Five stages of construction

Illustrations of the thermal store from bare vessel to home connection.

  1. The pressure vessel

    A welded steel vessel certified to PD 5500:2024+A2 (Category 2), independently tested to 17.86 bar: more than double its 8 bar operating pressure.

  2. High-performance insulation

    High-performance insulation minimises heat loss, keeping running costs down and delivering lower energy bills.

  3. The clamshell casing

    A protective outer shell encloses the insulated vessel, giving the finished unit its clean, boiler-sized footprint and weatherproof finish.

  4. Sensors, valves and actuators

    Precision actuators, flow valves, and temperature and pressure sensors are fitted.

  5. Connected to your home

    The finished unit connects to your existing wet central heating system and mains water.

Full specification
Energy capacity40 kWh
Heat output30 kW
Operating temperature50–175°C
Operating pressure0–8 bar g
Vessel certificationPD 5500:2024+A2 Category 2 · tested to 17.86 bar g by British Engineering Services
Round-trip efficiency~90% measured
Design lifeMore than 30 years
Storage mediumWater · non-toxic, non-degrading, no cycling degradation
InstallationLight dry weight · filled on-site · designed for a one-day swap in the existing boiler or cylinder footprint
Hot waterMains-pressure domestic hot water via heat exchanger · hot water cylinder required
Space heatingConventional wet central-heating circuit · no emitter upgrades required
Grid integrationFixed off-peak charging initially · smart, grid-responsive charging planned for 2027

News from Hestora

Progress on prototypes, home trials, and our journey to bring zero-emission heating to the homes we already live in.

  • Illustrative test-chart placeholder · No measured data

    Development

    Engineering the future of home heating

    Hestora is refining its thermal energy store prototypes ahead of UK home trials, where the team plans to test a direct swap from gas.

  • Illustrative cutaway showing pressurised water and insulation
    Illustrative cutaway · Not to scale

    Designed for purpose

    Engineering a direct swap

    How Hestora matches a gas boiler's output with high-temperature, high-pressure design — a full day of heat, stored overnight, in a boiler-sized footprint.

  • A terrace of colourful homes in London
    Stock photo placeholder

    Mission

    A data-driven approach to Net Zero

    Domestic heating causes 21% of UK emissions. Why 28 million existing homes need a heating solution that works without a deep retrofit.

All news

Common questions

Will it fit in my home?

Hestora has a compact 660 mm × 660 mm footprint, similar to a typical white good or hot water cylinder. It arrives lightweight and is filled with water on-site, making it easier to move through hallways and up stairs. It is designed for houses, bungalows and maisonettes with a wet central heating system. A hot water cylinder is required. If you have a combi boiler without one, a cylinder is added during installation.

How is it certified?

The prototype is UKCA certified. British Engineering Services independently tested the pressure vessel at more than double its maximum daily working pressure. The vessel is certified to PD 5500:2024+A2 (Category 2).

When is it available and what does it cost?

A monitored pilot of more than 20 homes is planned from November 2026, with commercial sales planned for 2027. The final customer cost will depend on funding, including a £2,500 grant and approximately £1,000 in carbon-offset funding. £3,500 is the estimated installed cost after the Boiler Upgrade Scheme grant and carbon-offset funding. The grant is subject to MCS certification and approval.

How does it compare to a heat pump?

Heat pumps are an option for homes that suit them. Hestora is designed for homes where a heat pump may be impractical because of outdoor space, existing radiators, tight access or budget. Both reduce gas use and suit different homes.

Do I need new radiators?

No. Hestora connects to your existing wet central heating system and is designed to deliver the same high flow temperatures using your existing radiators and pipework.

I'm an installer — how do I get involved?

Hestora invites installers to register their interest in joining its installer network.

Do I need underfloor heating?

No. Hestora works with existing radiators or underfloor heating. If you already have underfloor heating, it can deliver heat at the lower flow temperatures that system needs.

Is there a government grant?

The Boiler Upgrade Scheme grant is expected to apply to qualifying thermal energy stores. Hestora’s eligibility is subject to certification and approval. Hestora reported that the BSI performance standard and the MCS design and installation standard were awaiting approval.

What tariff do I need?

You will initially need a suitable electricity tariff with a fixed off-peak window. Developments planned for 2027 would introduce smart, grid-responsive charging and potentially earn rewards through NESO’s Demand Flexibility Service, including demand turn-up events.

What about flats?

Hestora’s initial focus is on houses, bungalows and maisonettes with individual heating systems. Flats and properties with shared heating systems are planned for later product phases.

Do I need to keep my hot water cylinder?

Yes. Hestora requires a hot water cylinder and connects into your existing system to heat your radiators and water. If your home has a combi boiler without a cylinder, a new one will be added during installation.

I don't own my home.

Hestora offers to speak to your landlord on your behalf or provide information for you to share with them.

Who Hestora works with

Research, accelerator and manufacturing partners behind the thermal store.

Partner logo placeholders

Imperial College London
Climate Innovation Platform accelerator partner. Technical mentorship, lab access and route-to-market support.
University of Birmingham
Academic partner on the Climate Innovation Platform, contributing materials science and thermal storage research.
Energy Systems Catapult
Provides guidance through the Climate Innovation Platform accelerator, run jointly with the University of Birmingham.
Climate Innovation Platform
A business accelerator for energy technology innovation in the West Midlands. Hestora is a member of the fifth cohort.
Royal Institution
Co-lead institution delivering Undaunted’s accelerator for climate innovators.
Undaunted
Supports early-stage climate innovation across London, the UK and beyond. Hestora is a member of the Greenhouse’s tenth cohort.
Elmatic
Electrical and controls engineering partner supporting the design of Hestora’s control electronics and switchgear.
LTI Metaltech
Precision metal fabrication partner for the pressure vessel and structural components of the Hestora unit.
SWEP
Temperature engineering partner supplying precision heating elements used in the Hestora thermal core.
BigBear Plastic Products
Manufacturing partner supplying moulded plastic components for the housing and fittings.
All Valves Online
Valve and flow-control component supplier, providing certified hardware for Hestora’s plumbing and safety systems.
AVA Actuators
Smart actuator technology partner supplying the precision actuators that control charge and discharge flow.
Etex Group
Insulation materials partner supplying the high-performance insulation that keeps standing losses low.
Industrial Trading Solutions
Industrial supply and distribution partner sourcing certified components and fittings from UK manufacturers.

Register your interest

A monitored pilot of more than 20 homes is planned from November 2026, with commercial sales planned for 2027.

Priority access
Hear first about pilot places and the planned 2027 commercial rollout.
Grant guidance
Find out when the Boiler Upgrade Scheme grant becomes available and how to claim it.
Personal savings estimate
Get a tailored estimate based on your home details.
Progress updates
Receive updates on certification milestones, pilot results and pricing. Unsubscribe at any time.
A terrace of colourful homes in London
Stock photo placeholder
Interest form preview

The form is disabled in this concept. No data is collected or sent.

Enter address manually

Follow the move away from gas

Hestora plans to share updates as home trials begin and commercial launch approaches. Updates are occasional and subscribers can unsubscribe at any time.

Registration preview